Skip to content
Test versionSearch

Home and energy

Fence quantities from uninterrupted runs

Calculate fence quantities for each uninterrupted run: nominal bays and posts from the run length, with gates and openings excluded beforehand.

How it worksFAQRelated tools

Content reviewed:

Edit the example values, press Calculate and download the result if you need it. Editing or resetting clears the result; nothing is automatically saved.

Enter lengths after excluding gates and openings. Each positive run has bays plus one post; separate runs have separate endpoints. Reconcile shared corners manually before ordering. Additional gate/corner posts are entered explicitly, never inferred. Last-bay length is nominal geometry, not approved spacing, loading, installation or legal design. All defaults are arbitrary editable examples. Use one consistent tax basis for prices. Panels and last-bay length use entered decimal run lengths and spacing before division. An exact full bay does not add a panel; an actual excess still does. Every disconnected run keeps its own endpoint posts and ceiling. Reported totals and costs remain approximate. Long run lists in scenario CSV/TXT are saved as numbered text parts. Each part is a JSON string: decode each part, then join in order to recover the complete input exactly. Native JSON retains the full run list.

Decimal results are approximate. Inputs stay in this browser tab.

How it works

Quantity arithmetic on the building figures you enter; the result lists every input and output. It is not a structural design and does not check national building law. Enter lengths after excluding gates and openings. Each positive run has bays plus one post; separate runs have separate endpoints. Reconcile shared corners manually before ordering. Additional gate/corner posts are entered explicitly, never inferred. Last-bay length is nominal geometry, not approved spacing, loading, installation or legal design. All defaults are arbitrary editable examples. Use one consistent tax basis for prices. The separate feather-edge worksheet counts boards under your explicit layout: one full first board, constant positive overlap below board width, then a trimmed last board. For each supplied clear span L, board width W and overlap O, use zero boards when L is zero; otherwise one plus ceil(max(L-W,0)/(W-O)). Enter integer millimetres and round each of 1 to 4 spans separately before summing. The original building-quantity and matrix functions remain authoritative. This covers supplied board geometry, without posts, rails, fixings, stock reserve, cutting plans or a complete fencing bill of materials.

Worked example

Editable entered-assumption example. For your supplied board width of 150 mm, overlap of 25 mm and one clear span of 1000 mm, this layout needs 8 boards. These entered dimensions are an arithmetic example, not a product recommendation.

Worked example

With these example values the calculator gives the result below. You can change any value in the form above.

Inputs

Run entry
One uninterrupted run
Length excluding openings (m)
10
Entered maximum nominal bay length (m)
3
Additional posts (integer, avoid double counting)
2
Entered price per bay (GBP)
20
Entered price per post (GBP)
10

Result

Net fence length (m)
10
Nominal bays
4
Posts for separate run endpoints
5
Entered additional posts
2
Total posts
7
Entered bay cost
80 GBP
Entered post cost
70 GBP
Total entered cost
150 GBP

Frequently asked questions

How do I calculate fence bays and posts?

Enter the net length of each uninterrupted fence run, after excluding gates and openings. Each positive run has its nominal bays plus one post, and separate runs have separate endpoint posts.

How are shared corners and gate posts handled?

Reconcile shared corners manually before ordering. Additional gate and corner posts are entered explicitly and never inferred.

What is the last bay length?

It is nominal geometry, not approved spacing, loading, installation or legal design. An exact full bay does not add a panel, while an actual excess still does.

How do I split a frontage at an opening?

Use the split tool to enter one opening in a straight frontage. It creates two separate runs with separate endpoints and adds no gate posts. Then calculate in the main form.

How many feather-edge boards do I need?

The first board of each span is full width, and each later board adds its width minus the overlap. The formula is one plus ceil(max(L-W,0)/(W-O)). For 150 mm boards, 25 mm overlap and a 1000 mm span, 8 boards are needed.

What does the feather-edge worksheet not include?

It covers supplied board geometry only, without posts, rails, fixings, stock reserve, cutting plans, offcut reuse or a complete fencing bill of materials.

Are the default numbers recommendations?

No. All defaults are arbitrary editable examples. Use one consistent tax basis for prices, and note that reported totals and costs remain approximate.