Skip to content
Test versionSearch

Home and energy

Post and rail quantities from your separate runs

Enter each uninterrupted run after excluding openings. Every run keeps its own end posts. Your same rail-piece count applies to every nominal bay, including the last shorter bay.

Enter separate uninterrupted runs after excluding openings. Run 1 is required; blank optional runs are unused, while entered zero remains known. State and confirm your counting basis. Read the form for numerical limits.

JavaScript is required for this named form and its five complete-file controls. No figures, units or examples are selected automatically. Editing or clearing inputs invalidates the result. Files contain your entered values and the complete original calculation record. This local worksheet does not provide professional advice.

Decimal results are approximate. Inputs stay in this browser tab.

How it works

Count nominal bays and endpoint posts separately for each selected run, then multiply total bays by the supplied rail-piece count per bay. The shorter last bay uses the same rail count. No shared corners, cutting schedule, cost quote or structural approval is inferred.

Worked example

Synthetic one-run entries of 10 m, spacing 3 m, 3 rail pieces per bay and 0 additional posts give 4 nominal bays, 5 posts and 12 rail pieces.

Frequently asked questions

How do I calculate how many fence posts and rails I need?

Enter each uninterrupted run in metres after excluding openings, the post spacing and the rail pieces per bay. The post and rail calculator counts bays and end posts per run and multiplies total bays by the rail pieces per bay.

How many posts and rails do I need for a 10 m fence?

With posts every 3 m and 3 rail pieces per bay, a single 10 m run gives 4 nominal bays, 5 posts and 12 rail pieces.

How does the fencing calculator treat a shorter last bay?

The last shorter bay counts as a nominal bay and uses the same number of rail pieces as every other bay.

Should I include gates and openings in the fence run length?

No. Enter each uninterrupted run after excluding openings. Every run keeps its own end posts, and shared corners and gate posts are not inferred.

What limits apply to the post and rail inputs?

Runs are entered in metres up to 1,000,000 with at most three decimal places, and the spacing must be positive. Rail pieces per bay range from 1 to 100, and additional whole posts from 0 to 1,000,000.

Does the post and rail calculator give cutting lists or costs?

No. The counts do not specify stock lengths, cuts, fixings, waste or structural suitability, and no cutting schedule or cost quote is produced.